2744 Southview Dr #2, Wylie, TX 75098 Mon-Fri 9am-6pm
Now booking one-day installs sales@roofingnorthtexas.com

Ten hours on your slab. Twenty years on the floor.

Here is exactly what happens between the truck backing in and you parking on it — including the three steps most installers skip.

01

Move-out & masking

You clear what you can; we move the rest and shift it back at the end. Walls, door tracks, water heaters and the threshold all get masked before a single tool starts.

7:00 AM
02

Diamond grinding to profile

Multi-head planetary grinders with diamond tooling open the concrete to a CSP-2 profile. Everything runs through HEPA vacuums, so there is no cloud rolling into the kitchen. We never acid etch.

7:30 AM
03

Crack, joint & spall repair

Every crack gets chased open and filled with a structural polyurea that flexes with the slab and takes coating. Control joints are honored, not smeared over — that is why they do not telegraph back through in year two.

9:30 AM
04

Moisture check & primer

Slabs that read high get a moisture-mitigating primer before anything pigmented goes down. It is the difference between a floor that lasts and a floor that bubbles next August.

10:30 AM
05

Pigmented base coat

A 100% solids polyurea base is rolled and back-rolled wall to wall, including a hand-cut border at every edge and up the toe-kick if you want a cove.

11:00 AM
06

Full-flake broadcast

Your flake blend is thrown to refusal — meaning the floor will not take another chip. Partial broadcast is cheaper and it is why budget floors look blotchy under a work light.

11:45 AM
07

Scrape, vacuum & reclaim

Once the base kicks, loose flake is scraped flat and vacuumed up. This is the slow, unglamorous hour that decides whether the floor feels smooth or like sandpaper.

1:30 PM
08

Two clear polyaspartic top coats

Two clear coats lock the flake in and take the system to 20–24 mils. Anti-slip aggregate goes into the final coat if you asked for it.

2:30 PM
09

Reset, walk-through & warranty

We put your shelving and benches back, walk the floor with you under a light, and hand over the written warranty. Foot traffic that evening, vehicles the next day.

5:00 PM

Before We Arrive

What we need from you.

  • The garage emptied of vehicles and anything you can carry out
  • Access to one exterior outlet and a hose bib
  • The garage door left usable for the day
  • Pets kept inside — grinders are loud
  • Somewhere else to park for about 24 hours

Park on it tomorrow. Get your price tonight.

Most North Texas garages are ground, coated and cured in 1 day. Take sixty seconds, get a real number, and pick your date.

Call Now Free Quote