Everything people ask before they say yes.
If your question is not here, call the shop. We would rather answer it than have you guess.
One day for the polyaspartic system — we are usually on site by seven and finished by five. You can walk on it that evening and park a vehicle on it twenty-four hours later. The epoxy system takes two days on site and three to four days before vehicles.
Acid etching produces a surface that looks profiled but is nowhere near the mechanical bond a diamond grinder creates. Almost every failed floor we tear out was acid etched. Grinding costs us more in time and tooling, and it is the single biggest reason our floors stay down.
A 2-car garage up to 450 sq ft is $2,499 and a 3-car up to 650 sq ft is $2,999, with professional installation included in both. Removing an existing coating, repairing cracks or mitigating moisture are the only things that add to it, and all four are priced publicly on our pricing page. The estimator on this site gives you your exact number in about a minute.
Peeling is a bond failure, not a product failure. It happens when the slab was not opened up mechanically, when moisture was never tested, or when the coating went over an existing finish. We address all three on every job, and we warranty against delamination for fifteen years in writing.
Existing cracks get chased open with a crack chaser, cleaned out, and filled with a structural polyurea that flexes with the slab and accepts coating. Control joints are honored rather than bridged. We cannot stop a foundation from moving, so genuinely new structural cracks are not covered — but everything we repair is.
No, and anyone who says yes is setting you up. If there is an existing coating it comes off completely before we start. That is what the removal line on your estimate covers.
The flake itself creates a mild texture, which most people find is enough for a garage. If the floor will see water regularly — a pool deck, a patio, a wash bay — we add an anti-slip aggregate to the final clear coat at no meaningful cost.
The polyaspartic top coat is aliphatic, which means it is UV stable and will not amber. This matters in Texas, where an open garage door means direct afternoon sun on the floor every day. Standard epoxy will yellow — that is one of the reasons we top coat everything with polyaspartic.
A dust mop for everyday, and a hose or a mop with a mild degreaser when it needs more. No wax, no sealer, nothing to reapply. Avoid anything with a strong acid or a citrus stripper in it.
For at least the walk-through at the start and the end. In between you are welcome to leave — we will text you photos as the floor goes down.
Empty the garage of vehicles and anything you can carry out. We will move what is left and put it back at the end. We also need one exterior outlet and access to a hose bib.
TRC employees, on TRC insurance, under a TRC license. The garage division is staffed by the same company that has been roofing North Texas out of Wylie for twenty years.
It locks your price and holds your place on the install calendar. It comes straight off your total, and it is refundable in full any time before we start grinding.
No. The same systems go down on patios, pool decks, driveways, workshops and commercial bays. Garages are simply the most common request, which is why they are the ones we publish a flat price for.
Buyers notice it, and appraisers treat a finished garage as usable square footage rather than storage. It will not carry a sale on its own, but of the things you can do to a garage for a few thousand dollars, it is the one people comment on at a showing.